论文部分内容阅读
一、开工初期的情况一九五○年春,西遼河苏家堡的春修工程,内蒙哲里木盟盟府规定在一○○至二○○公尺的取土距離,每工应做一·五公方土。但在開工的前几天,民主队作第一道顺水坝,其取土距離为三六○公尺,工作效率最高的是一·三二公方,最低的仅作○·九公方。和平队做第一道排水垻,其取土距离为二四○公尺,工作效率最高的
First, the start of the situation In the spring of 1955, the West Liaohe Sujiapu spring repair project, Inner Mongolia Zheli League alliance government provisions in the distance of 100 to 200 meters of earth-taking, each work should be done Five public square soil. However, a few days before commencement of construction, the Democratic Progress Corps made its first dam along the route with a distance of 3 600 meters. The highest efficiency was 132 workers and the lowest was only 0.9 KMT. Peace Corps to do the first drainage 垻, the soil distance of 240 meters, the highest efficiency