中国第一次用水力机械冲填筑堤试验工程已于四月上旬在淮河中游安徽寿县开工了。参加这项试验工程的有来自北京水利科学研究院、华东水利学院、黄委会勘测设计院等约25个单位的工程技术人员。水力冲填堤试验工程处由治淮委员会直接领导。工程地点选在淮河南岸寿县方家坎子附近,在正阳关下游约20公里,冲填堤段长200公尺,离淮 China first used hydraulic machinery to fill the embankment pilot project was started in early April in Shou County, Anhui Province, the middle reaches of the Huaihe River started. Participate in this pilot project from Beijing Institute of Hydraulic Research, East China Institute of Hydraulic Engineering, Design and Research Institute of the Yellow River Commission about 25 units of engineering and technical personnel. The hydraulic impoundment embankment test agency is directly led by the Huaihe Commission. The project site is located in the vicinity of Shoujiakancun on the south bank of the Huaihe River. It is about 20 kilometers downstream from Zhengyangguan.
其他文献
婴幼儿尿床比较常见,凡3岁以后的孩子白天不能控制排尿或不能从睡觉中醒来自觉排尿,即称原发性遗尿症。遗尿现象会随年龄增长而减少,据调查,4岁半的小儿有12%遗尿,5岁为10%,
地质统计学提供了多种能令人满意地用于解决地质问题的估算和模拟技术。在这种意义上,条件地质统计模拟用于计算一个地震序列中一个震级小于或等于确定震级的地震的发生概率
在中国水利1956年第9、10、11期上发表了肖秉钧同志的“引黄、汉水经北京到冀东配合引滦以开辟华北航运灌溉的意见”。我对黄河下游知道得不多,对海河流域规划研究得也很少
CNPC油气地球化学重点实验室第三次学术委员会会议暨吐哈盆地油源研讨会于2000年9月25日至28日在北京中国石油勘探开发研究院召开。常务副主任张水昌博士、副主任钟宁宁博士和侯
病例男,5岁,因生长发育迟缓2年、发烧7天于1996年7月24日入院。患儿于2年前出现眼睑及下肢凹陷性水肿,尿少,在我科确诊为肾病综合征,给予强的松口服1年,浮肿消退,尿蛋白转阴,但出现生长发育落后,饮
根据绿泥间蜡石及其主晶的层堆垛结构特征和非平衡态热力学理论,建立了非平衡条件下,此类晶体自组织成因的非线性动力学模型──“沈括规”.其数值模拟结果已成功地解释了表观单
采用半导体抽运腔内倍频的方法,获得了可满足医疗应用的瓦级全固态56mm黄光激光输出。在比较和分析了Nd:YAG激光晶体各主要谱线的激光参数之后,通过谐振腔膜系的设计抑制了增益
在油田勘探开发的各个阶段,井数据显然是建立真实三维油藏模型的关键参数。通常,油藏模型基于已有的数据而建立,尽管它未必是油田建模的最佳数据。已有的数据可能不足以广泛
如果顆粒層內的滲透流速V在層流范圍吋,达尔西法則表示,滲透流速与水面坡度h/l成正比,則V=k·h/l。式中k称为渗透系数,它决定于颗粒层及流体的性質。换句话说,对某一种流体
一“可持续发展”(sustainable development)概念是从联合国制定的指导国际社会经济发展的大战略借用过来的;我国在制定社会经济发展的可持续发展战略时把“科教兴国”纳入作