小浪底水电站水流含沙量高 ,水头较高 ,水轮机抗磨蚀问题严重。为了减轻水轮机的磨损 ,设计制造时采取了一些措施 ,如 :优化水工布置 ,减少过机沙量 ;优化水轮机参数 ,降低相对流速 ;改善部件结构 ;采用优质材料 ,提高制造质量 ;涂敷防护材料等。同时为了缩短检修的停机时间 ,适当增加了备品备件。为及早发现运行中的异常现象 ,装设了振动、摆度、空蚀及效率等监测仪表。厂家提供了可能产生空蚀涡带区域和运行工况范围线供运行参考。采取以上措施旨在实现小浪底水电站汛期正常发电运行。制造商承诺在运行 80 0 0h的保证期 ,水轮机转轮磨蚀量可控制在 5kg以下 ,大修间隔为 3年。随着水库和机组的投入使用 ,这些措施将逐项得到检验。
Xiaolangdi Hydropower Station sediment flow is high, higher head, water turbine anti-abrasion problems. In order to reduce the wear and tear on the turbine, some measures have been taken during design and manufacture, such as: optimizing the hydraulic layout and reducing the amount of sediment; optimizing turbine parameters, reducing the relative flow rate; improving the structure of components; using high quality materials to improve the manufacturing quality; Materials and so on. At the same time in order to reduce maintenance downtime, an appropriate increase in spare parts. In order to detect abnormalities in operation as early as possible, a monitoring instrument such as vibration, swing, cavitation and efficiency was installed. The manufacturer provides a range of cavitation erosion vortex zone and operating conditions for the operation of the reference line. The above measures are to achieve the normal operation of Xiaolangdi Hydropower Station in flood season. The manufacturer promised that during the 80,000h period of operation, the turbine runner abrasion can be controlled below 5kg and the overhaul interval is 3 years. As the reservoirs and units are put into use, these measures will be tested one by one.