导流围堰施工计划的动态概率设计方法

来源 :水利学报 | 被引量 : 0次 | 上传用户:comeonlinli
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
拟订围堰施工计划即设计河道截流后各月围堰修筑应达到的高程,在运用随机过程理论研究了堰前水位的概率特性后,提出了围堰施工动态保证率,从而导出了导流围堰施工计划的动态概率设计方法。
其他文献
This work investigates the performance of combined hybrid high concentrated photovoltaic/thermal collector (HCPV/T) in Kuwait harsh climate. The proposed system
三峡工程混凝土纵向围堰施工具有工程量大,工序复杂,影响因素多且变化快、工期紧迫等特点,为了较好地解决施工过程中的随机问题,选用了GERT网络模型,本文给出了纵向围堰关键施工部位--堰
Objective: “5.12” Wenchuan Earthquake killed 70,000 people and left more than 90,000 people injured seriously. This study was to analyze the wound features an
本文针对三维水流特性,引入通度概念处理不规则计算边界,用VOF法追踪自由表面,采用修正的K-ε模型封闭Reynolds方程,分别计算了溢流坝水流及消力池中水跃.计算结果较好地与实验结果符合.
Among the Greek islands, 61 are based—currently—on autonomous electrical systems for covering the electrical energy demand and are characterized as Non-Interc
In this paper, a method to detect a decrease in the output power of photovoltaic systems is proposed. This method is based on using satellite irradiance data. I
Supercharging is the process of supplying air for combustion at a pressure greater than that achieved by natural or atmospheric induction, as applied to interna
凝胶时间是化学灌浆施工中的一个重要参数,本文应用反应动力学理论,对丙烯酸钙化学浆液的凝胶时间与浆液组分浓度、引发剂浓度等的相互关系进行探讨,给出了它们之间的定量关系式
本文探讨高边坡开挖与加锚的优化设计,主要是预应力锚索的最优间距和开挖的最优顺序对某大型水电工程的应用计算显示,成果可信。
本文进行了有毒物重金属铅等在黄河中游天然河道中的输送和迁移的水质模拟研究,重点研究了大量泥沙对其运动和归宿影响及水质模型的率定和检验方法,完成了重金属在不同水情期,不