论文部分内容阅读
走近贵阳凤凰山,特别引人注目的是一座顶端红白相间、挺拔入云的烟囱。这座240米高,被誉为“贵州之最”的园柱形建筑,标志着1928年中秋之夜点亮山城贵阳第一盏电灯的贵阳发电厂,如今正处在继往开来的第二创业高潮中。 贵阳发电厂现在拥有职工1700余人,总装机容量17.5千瓦。改革开放以来,该厂把调动人的积极因素放在一切工作的首位,充分调动和发挥职工的积极性、创造性,依靠科技进步大搞技术革新和技术改造,整治老化陈旧设备,努力恢复机组生产能力,积极采用现代管理手段,
Approaching Fenghuang Mountain in Guiyang, it is particularly striking that there is a chimney with red, white and blue tops. This 240-meter-high, pillar-shaped building known as the “most in Guizhou” symbolizes the Guiyang power plant that lit the first light of Guiyang in the mountain city on the Mid-Autumn Night of 1928. It is now in the second climax of the future. in. Guiyang Power Plant now has more than 1,700 employees and a total installed capacity of 17.5 kilowatts. Since the reform and opening up, the factory has placed the positive factors of mobilizing people at the top of all work, fully mobilized and brought into full play the enthusiasm and creativity of employees, relied on scientific and technological progress, vigorously engaged in technological innovation and technological transformation, rectified aging and obsolete equipment, and worked hard to restore unit production capacity. Actively adopting modern management methods