安徽省交通局港航工程处疏浚四队是一个使用40立方米/小时绞吸式挖泥船的工程队,主要任务是疏浚航道。曾因过于强调航道的特殊需要,组织施工时经常发生航道疏浚与农业、水利和群众利益之间的矛盾,出现了“三多”,即扯皮的事多、要求赔偿损失的多、停工等待处理矛盾的现象多,不仅影响航道疏浚工程的进展,也不利于施工地区农业、水利的综合利用。
The Dredging Team 4 of the Hong Kong and Shanghai Branch of the Traffic Bureau of Anhui Province is an engineering team using a 40 m3 / h cutter suction dredger. Its main task is to dredge the waterway. Due to the over-emphasis on the special needs of the waterway, the contradiction between waterway dredging and the interests of agriculture, water conservancy and the masses often occurs during the construction of the organization. There have been “more than three” problems, Contradictions and many other phenomena not only affect the progress of waterway dredging projects, but also not conducive to the comprehensive utilization of agriculture and water conservancy in construction areas.