Thingadong-1井是缅甸D区块上的一口预探井,在钻至井深1 712.32 m处时发生了气侵溢流,用密度为1.48 g/cm3的钻井液建立了井下压力平衡。电测解释有水层14套、含气水层19套、气水同层1套、二开井底气层1套(裸眼测试)。下套管结束后循环钻井液时发生了失返性漏失,低排量间断性地泵入堵漏浆264 m3后静止堵漏46 h,堵漏成功(未验证井下承压能力)。施工后的水泥浆在失重状态下,气侵、水窜等因素易影响固井质量。应用低黏度、低切力先导钻井液,加重隔离液,微膨胀、非渗透、多凝阶梯密度防漏防气窜水泥浆体系等技术措施,完成固井施工作业。在施工中漏失5 m3水泥浆,随着水泥浆的漏失,浆体中的橡胶堵漏剂和纤维堵漏剂发挥了防漏堵漏效果。产层段封隔优质,满足了测试要求。
Well Thingadong-1 was a pre-exploratory well on Burma’s block D, and gas-bearing overflow occurred at a depth of 1 712.32 m. Wellbore pressure balance was established with drilling fluid with a density of 1.48 g / cm3. There are 14 sets of water layers, 19 sets of gas-bearing water layers, 1 set of gas and water layers, and 1 set of 2 bottom-opening gas layers (naked eye test). Loss of return loss occurred when the drilling fluid was circulated at the end of the casing. After low-displacement intermittent pumping of 264 m3 of slurry, plugging was stopped for 46 hours, and the plugging was successful (the underground bearing capacity was not verified). Cement slurry after construction in the state of weightlessness, gas invasion, water channeling and other factors easily affect the cementing quality. Application of low viscosity, low shear pilot drilling fluid, aggravate the isolation fluid, micro-expansion, non-permeable, multi-coagulation ladder leakproof anti-gas channeling cement slurry system and other technical measures to complete cementing operations. Lost 5 m3 of cement slurry in the construction. With the loss of cement slurry, the rubber plugging agent and the fiber plugging agent in the slurry exert a leakage preventing and plugging effect. Production section seal high quality, to meet the test requirements.