论文部分内容阅读
在党的科学研究工作必须和生产实践相结合的方针指导下,1958年7月15日至8月15日我们在武汉地区选择了若干类型的工业厂房屋顶,进行了有关热工性能的测定与调查。目的在于鉴定现有屋顶结构的热工性能和隔热效果,从中找出合理的方案;给设计单位提供具体的设计资料;探讨目前建筑实践中在隔热方面存在的问题,以及检验现有的理论计算方法的适用性,使建筑更合理、更有效、更经济地抗卸自然气候的不利因素,以便更好地为人民生活和生产服务。
Under the guidance of the principle that the party’s scientific research must be combined with production practices, we selected several types of roofs of industrial plants in Wuhan from July 15 to August 15, 1958, to measure the thermal performance. survey. The purpose is to identify the thermal performance and thermal insulation effects of existing roof structures, to find reasonable plans for them; to provide design agencies with specific design information; to discuss existing problems in thermal insulation in current construction practices, and to test existing ones. The applicability of the theoretical calculation method makes the building more reasonable, more effective, and more economical to resist the unfavorable factors of the natural climate so as to better serve the people’s life and production.