浅议监理项目的组织协调工作

来源 :科技致富向导 | 被引量 : 0次 | 上传用户:xinhongwei678
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
监理单位组织协调是贯穿在整个工程项目建设过程中的,涉及到工程的质量、进度、投资等多方面的。在工程建设规模、复杂程度、专业化程度都越来越高的今天,监理工程师对建设工程的组织协调凸显其重要。本文阐述了监理项目组织的协调原则,分析了相关单位组织协调的要求,提出了建设工程监理中的组织协调对策。 The organization and coordination of the supervision unit is carried out throughout the entire construction process of the project, involving the quality, progress, investment and other aspects of the project. Today, with ever-increasing scale, complexity, and specialization of engineering construction, the supervision engineer’s organization and coordination of construction projects highlights its importance. This article elaborates the coordination principle of the supervision project organization, analyzes the requirements for the organization and coordination of relevant units, and proposes the organizational and coordination countermeasures in the supervision of construction projects.
其他文献
进入新的历史时期,随着我国高等教育的发展和大学生群体特点的变化,如何做好大学生的思想政治工作,让他们学到丰富的知识和技能,顺利走上社会,对高校辅导员工作提出了新的挑
在当今大规模的开放系统互联的网络环境下,无论采用多么完善的安全保护措施,风险总是存在的.因而适当的方法是在整个网络通信过程中应用智能化的方法进行风险管理,如何使周密
以蚌埠闸闸墩除险加固的施工中,采用表面防碳化施工工艺为例,阐述施工过程及注意事项,介绍运用CT203材料防碳化处理工艺。 In Bengbu gate pier reinforcement construction
在环境保护、平衡燃气峰谷、改善电力负荷和能源的综合利用等方面,燃气空调的优越性是明显的。因此,政府应从全局的宏观调控上制定鼓励和推广燃气空调发展的政策。为在有条件
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
目的探讨溶栓后早期T波倒置对闭塞冠状动脉再通的诊断价值及预后。方法选择78例急性心肌梗死(AMI)接受溶栓治疗的患者,分为24h内T波倒置组和未倒置组,依据临床间接血管再通标
目的:探讨Bryan人工颈椎间盘置换术治疗颈椎病的围术期护理方法.方法:对12例颈椎病患者在术前做好评估,进行心理护理、呼吸道护理、唤醒试验练习,完善术前相关准备如体位练习
通过对影响节约成本的要因分析,指出了工务系统实施钢轨和辙岔焊补项目是节约生产成本的有效途径,指出了开展焊补作业的技术、经济和安全效益。
目的 探讨心理控制源和健康行为训练对酒精依赖惠者远期疗效的影响.方法 对首次住院治疗病情缓解的66例酒精依赖患者,随机分为两组,研究组(34例)在一般性药物治疗(苯二氮革类
以广西玉林市博白县西牛水库除险加固工程为例,论述了在大坝防渗加固设计过程中,通过对比分析大坝防渗加固设计方案的优缺点,合理选择防渗加固方案,提出采用高压旋喷灌浆方案