论文部分内容阅读
延迟焦化装置自运转以来,在总路线的光辉照耀下,在大跃进的形势推动下,工段的职工们不仅熟练地掌握了装置的正常操作,而且发挥了敢想敢干的精神,在原来设计的基础上对流程、设备和操作方法都进行了许多革新,找到了合适的物料平衡和操作条件,进行了处理各种原料和试制各种新产品的试验,不断地延长运转周期,减少运转中的产品损失。目前我们又在为打破“延迟焦化不能生产合格电极焦”的保守观点进行着斗争,并且已经有了初步的结果。本文打算根据操作当中的经验,对延迟
Delayed coking unit since its operation, the glorious shining of the general line, under the circumstances of the Great Leap Forward, the workers in the section not only proficiently mastered the normal operation of the device, but also dared to dare to do the spirit of the original design Based on the process, equipment and methods of operation have made many innovations, to find a suitable material balance and operating conditions, conducted a variety of raw materials and trial production of various new product testing, and continuously extend the operation cycle and reduce the running Product loss. At the moment we are struggling again to break the conservative view that “delayed coking can not produce qualified electrodes” and that preliminary results have been obtained. This article intends to delay the operation based on the experience