浅谈高速公路三大系统中心机房搬迁安置

来源 :公路交通科技(应用技术版) | 被引量 : 0次 | 上传用户:fgjfg111
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着时代的发展进步,新设备、新技术不断更新,既有的高速公路监控分中心机房、站级机房的设备往往需要更新换代、增加设备,而有些机房由于建成时面积偏小、建成时间长等缘故设备老旧,无法满足高速公路自身运营需求,必须对原有的机房进行搬迁。本文主要描述了高速公路三大系统中心机房搬迁时设备迁移及安装的步骤和注意事项,可为类似工程提供参考。 With the development of the times, new equipment and new technologies are constantly updated. Existing equipment for supervisory and control center of the expressway and substation of the station often need to be replaced and increased, while some rooms are small in size and completed in time Long and other old equipment, can not meet the needs of its own highway operations, the original room must be relocated. This paper describes the steps and precautions of equipment relocation and installation when the machine room of the three major systems in the expressway is relocated, which can provide reference for similar projects.
其他文献