Perth’s new 72 km long Southern Rail System opened in 2007. With a maximum speed of 137 km/hr and an average speed of almost 90 km/hr this system acts more lik
This research evaluated the suitability of stone dust in the design and production of High Perfor-mance Concrete (HPC). HPC mix was designed, tested, costed and
Travel time and delay are among the most important measures for gauging a transportation system’s performance. To address the growing problem of congestion in