Successive Boronizing and Austempering for GGG-40 Grade Ductile Iron

来源 :Journal of Iron and Steel Research(International) | 被引量 : 0次 | 上传用户:wuxin0226
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Boronizing and austempering were successively applied to a GGG-40 grade ductile iron in order to combine the advantages of both process in a single treatment. This new procedure formed a 30 μm thick boride layer on the surface with subsurface matrix structure consisted of acicular ferrite and retained austenite. Reciprocating wear tests showed that successive boronizing and austempering exhibited considerably higher wear resistance than conventional boronizing having a subsurface matrix structure consisting of ferrite and pearlite. Boronizing and austempering were successfully applied to a single treatment of GGG-40 grade ductile iron in order to combine the advantages of both process in a single treatment. This new procedure formed a 30 μm thick boride layer on the surface with subsurface matrix structure consisted of acicular ferrite and Reciprocating wear tests showed that successive boronizing and austempering showers higher higher wear resistance than conventional boronizing having a subsurface matrix structure consisting of ferrite and pearlite.
其他文献
目的 探讨滋养叶疾病的超声诊断,分析不同类型超声表现及临床手术方式选择的实用价值.方法 对52例滋养叶疾病的超声表现进行分类并加以分析.结果 良性滋养叶疾病占92.3%,其中
阐述了低变催化剂的失活原因,介绍了该厂在中串低工艺中原位复活技术的应用效果,提出了生产过程中保护催化剂应注意的几个问题。 The reasons for the inactivation of the
A detailed mathematical procedure of the optimization of the fluid flow in a tundish water model with and without flow control devices (weir and dam) was carrie
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
对进口结晶器保护渣进行具体分析 ,研制出两种大方坯结晶器保护渣 ,工业试验结果表明 :研制的渣能够替代进口产品 ,满足大方坯连铸生产工艺的要求 Based on the analysis of
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
通过对氨合成催化剂升温还原过程中水汽浓度测定方法的比较,能更准确地测定催化剂升温还原中的水汽浓度,合理地掌握催化剂升温还原的进度和时间,使催化剂还原后的活性更好。
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
介绍3×104t/a联醇装置的工艺流程及特点,并对生产过程的控制要求及催化剂的升温还原情况进行了总结。