河南省平顶山市电业局1996年9月向桃花山变电站架线,当架设的Ⅲ姚桃38~39号杆塔线路途径郊区桃花山村时,遭到了该村村民刘花婷的阻挡.刘以线路运行影响其家人人身安全为由,不让线路从她家房屋旁边经过.1997年1月9日,在乡、村领导的协调下,平顶山市电业局与刘花婷达成了如下协议:线路距村民刘花婷民宅的水平投影距离5.06米和净空距离均满足线路防护规程和设计规程的要求,民宅附近防护区域内的乔木树按豫政89-113号文规定一次赔偿处理.由于对该协议中提到的水平投影距离5.06米的理解问题,从而引发出一场一波三折的诉讼.
Pingdingshan City, Henan Province Electric Power Bureau in September 1996 Peach Hill substation line, when the erection of the Yao Peach 38 ~ 39 tower line way outskirts of Peach Blossom Village, was hit by the villagers Liu Huating. Liu to the operation of the line January 9, 1997, under the coordination of the township and village leaders, Pingdingshan Electric Power Bureau and Liu Huating reached the following agreement: Line from the villagers Liu Huating house Of the horizontal projection distance of 5.06 meters and clearance distances are to meet the requirements of the line of protection rules and design rules, residential area near the protected area tree trees according to the provisions of the Yuzheng 89-113 No. once compensation processing. As mentioned in the agreement level Projection distance of 5.06 meters understanding of the problem, which triggered a wave of litigation.