我厂原拥有两座100m~3高炉,采用通用设计70版图纸,于1971年6月份建成炼铁系统,形成年产生铁能力10万吨以上。由于客观历史原因,一代高炉炉龄仅4—5年的时间,一代产铁量约22万吨。1号高炉于1976年停炉直至大修扩容,由重庆钢铁设计院承担高炉本体的设计,因资金不足,热风炉改造没有同步进行,而是用分段实施的办法来解决资金困难问题,先上高炉后改造热风炉。根据1号高炉实际情况,对热风总管,除尘器等金属构件的测定结果,作了保留。高炉基础,卷扬机房等部分建筑设施加以利用外,其他都推倒重来。
Our factory originally possessed two 100m ~ 3 blast furnaces and adopted the universal design 70 edition drawings, built the ironmaking system in June 1971 and formed an iron production capacity of over 100,000 tons annually. Due to objective and historical reasons, a generation of blast furnaces is only 4 to 5 years old, generating about 220,000 tons of iron a generation. No.1 blast furnace shutdown in 1976 until the overhaul expansion, the Chongqing Iron and Steel Design Institute to undertake the design of the blast furnace body, due to lack of funds, the stove is not synchronized with the transformation, but with a segmented approach to solve the problem of financial difficulties, the first After the blast furnace renovation stove. According to the actual situation of the No. 1 blast furnace, the result of determination of the metal components such as the hot blast main pipe and the precipitator is reserved. Blast furnace foundation, hoist room and other parts of the building facilities to be used, the other are reinvent.