论文部分内容阅读
结合两个高层筒体剪力墙工程冬期滑模施工经验 ,介绍了冬期筒体剪力墙滑模施工需解决的问题和主要技术措施
Combining the winter sliding mode construction experience of two high-rise tubular shear wall projects, the problems to be solved and the main technical measures for the construction of the sliding mode of the winter shear wall are introduced.