论文部分内容阅读
1984年以前,我单位在立井井筒施工中,一直用金属模板进行井筒井壁混凝土浇注,它不论在速度上还是从质量上都收到了满意的效果。我们施工河南密县超化矿主副井井筒,主井净径4.5m,断面15.9m~2,基岩段平均月成井47.2m,最高达67.5m,井筒优良品率达87.0%;副井净径6.0m,断面28.3m~2,基岩段平均月成井48.0m,最高达68.0m,井筒优良品率达100%。在全国1984年17对立井井筒施工竞赛中分别列为第七名和第二名,这是由于把有敞露伸缩装置的金属模板改为具有密封伸缩装置的金属模板(以下简称密封金属模板),进一步提高了金属模板的使用性能。1986~1987年,我们曾先后在河南密县王庄矿东风井、巩县铁生沟矿主副井井筒施工中使用密封金
Before 1984, my unit in the shaft shaft construction, has been using metal formwork well wall concrete pouring, it both in speed and quality have received satisfactory results. We constructed the primary and secondary wellbores of the superfine mine in Mi County, Henan. The main well has a net diameter of 4.5m and a cross section of 15.9m ~ 2. The average monthly wellbore formation of the bedrock segment is 47.2m and the highest reaches 67.5m, with a well rate of 87.0% The net diameter is 6.0m and the cross section is 28.3m ~ 2. The average monthly wellbore formation of bedrock segments is 48.0m and the maximum is 68.0m. The yield rate of wellbores is 100%. In the national 17 well shaft construction competition in 1984, they were listed as the seventh and the second respectively. This is due to the change of the metal template with the exposed expansion and contraction device to the metal template with the sealed expansion and contraction device (hereinafter referred to as the sealed metal template) Further improve the performance of the metal template. From 1986 to 1987, we used sealing gold in Dongfeng well of Wangzhuang Mine in Mi County, Henan Province, main shaft and auxiliary shaft of Tieshenggou Mine in Gong County