论文部分内容阅读
为配合中南地区有关铁路局共同进行给水自动化试验工作,我总队于1976年12月完成了液压式给水自动化装置参考图的设计,可供现场试制和试验时参考。液压式给水自动化装置计有:缓冲稳压装置;液压反应装置;变换装置;水位联动装置和电气结线装置等五个部分组成。具体控制项目有;①水塔缺水自动开泵;②水塔满水自动停泵;③断相、真空、温升及超压事故保护;
In order to cooperate with the relevant railway bureaus of the Central and South China region to carry out the water supply automation test work, the corps completed the design of the reference diagram of the hydraulic water supply automation device in December 1976, which can be used as a reference for on-site trial production and testing. Hydraulic water supply automation device includes: buffer voltage regulator device; hydraulic reaction device; conversion device; water level linkage device and electrical connection device composed of five parts. Specific control items include: 1 Water tower water shortage automatic open pump; 2 Water tower full water automatic stop pump; 3 Phase, vacuum, temperature rise and overpressure accident protection;