刘家峽水电站,是我国开發黄河第一期工程的一个巨型的水力樞紐。在1955年5月开始設計之前,苏联葛夫利列茨水工?液涂档吕恋刭|?以谖夜墓こ碳际跞藛T的陪同下,到刘家峽进行了詳細的查勘,在各个可能修筑高埧的河段上,选出了四个比較埧址区傅嘉覀兡舛丝辈馊挝袷楹驮敿毜目辈庥嫽?展开了大規模的水力地址勘探工作。并具体帮助我們完成选定埧址区所需要的各項設
Liujiaxia Hydropower Station is a giant hydraulic hub for the development of the first phase of the Yellow River in China. Before the design was started in May 1955, the Soviet Union’s Gebrlitz Hydrographic Institute, with the escort of the night and night tombs and carbon sluices, went to Liu Jiaxia for a detailed survey. In each river section where it is possible to build a high-lying river, four comparative sites have been selected to carry out large-scale hydraulic site exploration work. And specifically help us complete the various settings required for the selected site area