龙滩水电站位于红水河上游广西壮族自治区天峨县境内,是以发电为主,兼有防洪、航运等综合效益的特大型电站。工程总装机4200 MW,2001年7月1日正式开工建设。为了满足中国大唐集团公司对水电工程项目投资控制的目标要求,中国水利水电建设工程咨询公司工程造价处承接了龙滩水电站执行概算的编制工作。2003年10月28日,《龙滩水电站工程执行概算编制工作大纲》通过审查,标志着龙滩执行概算工作正式启动。随后,龙滩执行概算编制组成员深入施工现场收集整
Longtan Hydropower Station is located in the upper reaches of the Red River in Guangxi Zhuang Autonomous Region Tian’e County, is based on power generation, both flood control, shipping and other comprehensive benefits of large-scale power station. The total installed capacity of 4200 MW, July 1, 2001 officially started construction. In order to meet the target requirements of China Datang Corporation for investment control of hydropower projects, the project cost department of China Water Conservancy and Hydropower Construction Engineering Consulting Company undertook the compilation of the budget estimates for the execution of Longtan Hydropower Station. October 28, 2003, “Longtan Hydropower Project Implementation Estimate Compilation Outline” passed the review, marking the implementation of Longtan budget estimates was officially launched. Subsequently, members of the drafting team of the executive summary budget of Longtan collected the entire construction site