论文部分内容阅读
一、灌浆基本情况太平湾电站混凝土坝22~#~32~#溢流坝段基础岩石固结灌浆工作,于1983年4至6月进行,主要工程量为:钻孔314个,总进
First, the basic situation of grouting Taipingwan Power Station concrete dam 22 ~ # ~ 32 ~ # overflow dam section of the basic rock consolidation grouting work, carried out in April to June 1983, the main works are: drilling 314, the total