Hepatic vein in living donor liver transplantation

来源 :国际肝胆胰疾病杂志(英文版) | 被引量 : 0次 | 上传用户:qazzaq123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Right lobe living donor liver transplantation (LDLT) is a major development in adult LDLT that has sig- nificantly increased the donor pool by providing larger graft size and by decreasing risk of small-for-size graft syndrome. However, right lobe anatomy is complex, not only from the inflow but also from the outflow perspective. Outflow reconstruction is one of the key requirements of a successful LDLT and ve- nous drainage of the liver graft is just as important as hepatic inflow for the integrity of graft function. Outflow complications may cause acute graft failure which is not always easy to diagnose. The right lobe graft consists of two sections and three hepatic venous routes for drainage that require reconstruction. In order to obtain a congestion free graft, several types of vascular conduits and postoperative interven- tions are needed to assure an adequate venous allograft drainage. This review described the anatomy, functional basis and the evolution of outflow reconstruction in right lobe LDLT.
其他文献
摘要:建筑工程的监督管理工作是一项复杂的工程,要做好这项工作,需要监督机构认真分析自身的特点,充分利用自己的长处,采取规范科学的内部安全管理方法和管理模式。文中只是探讨了监督管理模式,加强建筑安全生产监督管理工作的建议等问题。在实践工作中,作为监督人员,必须事无巨细,随时做好安全防备工作,方方面面均需有所准备,同心协力,才能按时保质地完成任务。  关键词:建筑工程,安全生产,监督管理    1加强
期刊
Background: Human telomerase reverse transcriptase (hTERT) and its components play a significant role in cancer progression, but recent data demonstrated that t
To the Editor :rnPancreatoblastoma (PB) is one of the exocrine pancreatic tu- mors and the most common malignant pancreatic tumor in young children. Patients ca
期刊
Biliary complications have always been a dreaded cause of morbidity after living donor liver transplanta- tion. While intrinsic variations in both graft and rec
摘要:园林工程的施工及养护管理是一门实践性很强的学科,园林种植属于短期施工工程,养护管理属长期、周期性工程。园林施工与养护管理两者是相互联系、相互作用、相辅相成、密不可分的。分析了园林施工及养护管理的特点,并就两者有机结合的对策进行了探讨。  关键词:园林;施工;养护;结合   一、引言  园林工程是一项长期而复杂的工作,包括园林设计、施工和养护。施工处于园林工程的中期,强调进度与质量,关注于最后
期刊
Previously, living donor liver transplantation was considered as a high-risk, high-retmedical treat- ment due to the relatively high short-term mortality. It is
期刊
Human echinococcosis is a zoonosis caused by Echinococcus (E.) tapeworms. There are different species, but E. granulosus and E. multilocularis have clinical rel
期刊
建设工程造价控制是一项集经济、技术、合同管理为一体的综合性工作,加强工程建设造价管理,严格控制工程竣工结算和经费在投资指标中,要采取有效手段加强建设项目全过程控制管理,合理使用资金。加强基础性工作,完善管理机制和法规规章,建立和充实造价管理机构、严格实行投资估算、设计概算、施工图预算、工程结算和竣工决算,健全造价管理人才队伍,落实造价管理责任制,合理确定全过程造价控制,下面浅谈几点工程造价管理和控
期刊
摘要 从公路建设项目后评价的发展、研究对象、内容和评价方法等方面总结了后评价工作的研究现状,并论述了各种评价方法的适用性。同时还提出有待进一步研究的问题,指出宜在评价内容、指标和权重的标准化研究、对新建公路项目以外对象的后评价研究及对于独立桥隧项目的后评价研究等方面开展进一步的研究工作。  关键词 建设项目后评价指标体系标准化     1 公路建设项目后评价发展  建设项目评价按基本建设程序可分为
期刊