结合水电工程建设的特点,对善泥坡水电站枢纽布置考虑的环保因素作了详细分析,从环保和工程的角度,推荐该电站采用上坝址筑坝、经右岸2.3km引水隧洞引水至法德大桥上游地下厂房发电的方案,虽损失了较大的发电效益,但最大程度降低了电站建设对当地生态环境的影响,贯彻落实了党中央十六届五中全会提出的“在保护生态基础上有序开发水电”的要求,使该电站的社会效益、经济效益和环境效益得到了协调发展。
Combined with the characteristics of hydropower project construction, the environmental factors considered for the arrangement of the Shanniupu Hydropower Station are analyzed in detail. From the perspective of environmental protection and engineering, it is recommended that the dam be dammed by the upper dam site and the 2.3km diversion tunnel on the right bank should be led to Fade Although the scheme of generating electricity in the underground powerhouse at the upper reaches of the bridge has lost a large power generation benefit, it has minimized the impact of power station construction on the local ecological environment and implemented the recommendations made by the Fifth Plenary Session of the 16th Central Committee of the Party Central Committee on the Protection of Ecological Foundations On the orderly development of hydropower "requirements, so that the social benefits, economic benefits and environmental benefits have been coordinated development.