1994年2月18日,内蒙古第一家电力股份制企业——海勃湾发电厂第一期2×100MW工程第一台机组提前半年竣工投产。机组整体质量经质量监督部门静态、动态评定来看是过硬的。 1号锅炉本体水压试验中,9500多道焊口,其中7787道受监焊口均无一渗漏。 1号汽轮发电机组,最大振动为1.8丝。 质量总评优良品率为91%。 其它附属机械和各个系统,经分部试运行、72小时试运行和
On February 18, 1994, the first unit of the 2×100MW project of the first phase of the Haibowan Power Plant, Inner Mongolia’s first power company, was completed and put into operation six months ahead of schedule. The overall quality of the unit is excellent in the static and dynamic evaluation of the quality supervision department. In the hydrostatic test of No. 1 boiler, there were more than 9500 welds, of which 7787 were not leaking. Turbo generator No. 1 with a maximum vibration of 1.8 filaments. The total quality of excellent products was 91%. Other ancillary machinery and systems, after subdivision trial run, 72 hours trial run and