如何确定电站经济的供电范围

来源 :水力发电 | 被引量 : 0次 | 上传用户:mahonglin
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
編制动力系統的規划应根据各部門的要求和系統的發展远景。在編制过程中,首先应研究本区域內水力資源的开發情况,更应仔細研究在綜合利用方面具有意义的大水力樞紐的建筑。当水力资源不足或建筑时間来不及以及由於其他原因(如洗煤的利用,供热等)不能修建水电站时,再考虑配备相当的热电站和火电站。这样就可以形成一个水火电站並列运行的 The preparation of power system planning should be based on the requirements of various departments and the development perspective of the system. In the preparation process, the development of the hydropower resources in the region should be studied first, and the construction of a large hydraulic hub with significance in comprehensive utilization should be carefully studied. When the hydropower resources are insufficient or the construction time is too late and due to other reasons (such as the use of coal washing, heating, etc.) when the hydropower station cannot be built, consider the allocation of equivalent thermal and thermal power stations. In this way, a hydrothermal power station can be formed in parallel.
其他文献
每看见羊,我就会想起一件往事。顿时,记忆之门被洞穿、推开。几年前,我家大的孩子跟我丈夫在县城住,我带一岁的小女儿在老家住。有一天早上,羊在圈里叫唤着不停,吵得人心慌意
澳大利亚物理学家正在回过头来进行一项曾由国立澳大利亚大学的奠基人S.M.Oliphant于四十多年前提出过的研究项目,以解决世界能源危机。研究人员J.L.Huges博士和等离子体物
自今年5月成立了工厂设计处以来,在全国大跃进形势的鼓舞下,为了尽早建立我国汽车工业体系,我处在局、厂领导的关怀和支持下,经过了将近半年的苦战,提前完成了向国庆节献礼
鱼嘴分江内外流,宝瓶直扼内江喉。成都坝仰离堆水,禾稻年年庆饱收。——董必武《观都江堰》都江堰有个游人到此必看的地方,这就是鱼嘴。为什么这个地方叫鱼嘴呢,外地游人总觉
粉末冶金在仪器仪表中的推广和应用交流会,于1983年12月14日至17日在广州召开。参加会议的有29个单位50名代表。会上交流了七项成果,它们是:粉末软磁零件在仪器仪表上的应用
法国原子能委员会发表的一份公报说,1983年8月31日是法国“凤凰”原型增殖堆运行十周年纪念日,该堆自第一次临界以来,向法国电力公司的电网输送了110亿度电。建在马尔库尔后
八月初,我院召开了党代表大会。大会在总结整风运动丰硕收获的同时,进一步明确了技术革命,文化革命运动的方向。随即又根据赵部长关于因陋就简问题的指示,结合我院任务紧急,
【苏联《原子能》1983年第54卷第4期第286页报道】苏联的铀矿床按成矿条件,大致分为热液铀矿床和水成铀矿床两类。铀矿开采方式有露天开采、地下开采和地下浸出三种。露天开
全国人民在鼓足干劲、力争上游、多快好省地建设社会主义的总路线的光辉照耀下,破除了迷信,解放了思想,精神焕发,敢想、敢于,各方面出现了新的大跃进形势。农业纲要40条要提
为了改变我国建筑材料落后状况,提高抗震性能,改善居住条件,国家建材总局会同有关省、市试制、试用了一些轻质、高强、多功能新型建材,计有:石膏板、加气混凝土板、石棉水泥