摘要: 随着现代电子产业的发展,建筑智能化的要求也越来越高,相应的建筑电气施工所涉及的管线也越来越多,但由于施工单位对施工规范理解的程度参差不齐,导致工程完工后建筑电气工程功能受到影响或存在安全隐患,甚至对建筑物主体结构造成威胁,因此需要在工程施工过程中加以控制。如何不断提高电气工程的施工质量,确保民用电气在使用过程中充分发挥其安全、稳定、高效作用,成为民用建筑电气施工技术及质量控制的重点。本文就此作出了深入的分析研究,可供同行参考借鉴。
关键词:民用建筑施工; 电气施工; 前期准备工作; 电气安装方法
Abstract: with the development of modern electronic industry, the requirement of intelligent building more and more is also high, the corresponding electrical building construction involves the pipeline more and more, but because construction unit to construction standard of understanding of degree is uneven, completed the project in the building electric engineering function affected or unsafe, or even to the main structure building threat, so need to be in construction process in controlled. How to improve the construction quality of electrical engineering, ensure civil electrical in use process give full play to its security, stability, high effect, be civil building construction technology and quality control electric focus. This paper made a in-depth analysis of this research, available for peer for reference.
Keywords: civil building construction; The preparatory work; Electrical installation method
中图分类号:F407.6 文献标识码:A 文章编号
前言
随着经济生活水平的不断提高,人们对电气安装工程质量有了更高的要求。目前,我国各种电气设备和民用電器有了很大的发展,民用建筑电气安装工程也应提高安装技术,以适应人们生活水平的需要。电气安装工程施工是建筑工程质量的重要保证,对竣工交付后住户的安全和正常使用意义重大。电气工程施工质量的好坏直接影响到建筑物功能是否正常运行,关系到该建筑的社会与经济效益。因此,必须加强民用建筑的电气施工管理。
一、电气工程施工前期的工作分析
设计图纸技术交底:在技术交底前,施工方除仔细认真地审图查找问题外,还要根据设计要求和施工图中的重点,注意对照强制性标准、施工验收规范和规条文说明,查看设计中有无不符规范要求之处;同时,施工人员除熟悉本专业技术外,还要了解相关专业知识,并及时做好预检记录。对施工用材料也要做好准备。焊管要求内壁光滑,无砂眼、毛刺、裂缝凹陷等缺陷。绝缘导管采用中型以上导管及配件外壁要有间距连续阻燃标记和制造厂标、管壁厚度均匀,符合规范要求,无破及管身变形现象。按线盒外观整齐,敲落孔齐全,无破裂及变形现象。配电箱壳体有一定的机械强度,周边平整无损伤,油漆完好无变形现象,接地排齐全。进场的材料必须符合设计要求,三证齐全且有进场检验记录。焊管敷设前,对其内壁刷防腐漆,钢管外壁根据敷设方式进行不同的防腐处理。钢管采用钢锯进行切割,管内铁屑清除干净。PVC 管使用剪管器,钢锯切割,断口后将管口锉平齐,保证管口平整光滑。提前编制电气预留孔洞方案,对电气预留孔洞的尺寸、标高及时向土建专业交底,电气专业负责复核。预埋前充分了解土建结构。在电气预埋时,要根据各施工作业段的大小、各类电气管线的多少,派专人负责与土建协调,同时选技术熟练的工人进行管线预埋,预埋结束自检合格后立即通知监理方进行验收,并及时办好隐蔽工程验收手续,以便土建尽早进入下一道工序,提高工作效率。
二、施工中各个阶段的电气安装方法分析
1、基础施工阶段的电气安装方法。在基础工程施工时,应及时配合土建做好强、弱电专业的进户电缆穿墙管及止水挡板的予留予埋工作。这一方面要求电专业应赶在土建做墙体防水处理之前完成避免电气施工破坏防水层造成墙体今后渗漏;另外一方面要求格外注意予留的轴线,标高、位置、尺寸、数量用材规格等方面是否符合图纸要求。进户电缆穿墙管和予留予埋是不允许返工修理的,返工后土建二次做防水处理很困难也不易所以电专业施工人员特别留意与土建的配合。按惯例尺寸大于 300mm 的孔洞一般在土建图纸上标明,由土建负责留,这时电气工长应主动与土建工长联系,并核对图纸,保证土建施工时不会遗漏。配合土建施工进度,及时做好尺寸小于300mm、土建施工图纸上未标明的予留孔洞及需在底板和基础垫层内暗配的管线及稳盒的施工。对需要予理的铁件、吊卡、木砖、吊杆基础螺栓及配电柜基础型钢等予理件,电气施工人员应配合土建,提前做好准备,土建施工到位及时埋入,不得遗漏。根据图纸要求,做好基础底板中的接地措施,如需利用基础主筋作接地装置时,要将选定的柱子内的主筋在基础根部散开与底筋焊接,并做好色标记,引上留出测接地电阻的干线及测试点,比如还需砸接地极时,在条件许可情况下,尽量利用土建开挖基础沟槽时,把接地极和接地干线做好。
2、结构施工阶段的电气安装方法。根据土建浇铸混凝土的进度要求及流水作业的顺序,逐层逐段地做好电管暗敷工作,这是整个电气安装工程的关键工序,做不好不仅影响土建施工进度与质量,而且也影响整个电气安装工程的后续工序的质量与进度,应引起足够的重视。现浇混凝土楼板内配管时,在底层钢筋绑扎完后,上层钢筋未绑扎前,根据施工图尺寸位置配合土建施工。注意不要踩坏钢筋。土建浇注混凝土时,电工应留人看守,以免振捣时损坏配管或使得灯头盒移位。遇有管路损坏时,应及时修复。对于土建结构图上已标明的予埋件如电梯井道内的轨道支架予理铁等以及尺寸大于 300 的予留孔洞应由土建负责施工,但电气工长也随时检查以防遗漏。对于要求专业自己施工的予留孔洞及予埋的铁件、吊卡吊杆,木砖、木箱盒等,电气施工人员应配合土建施工,提前做好准备,土建施工一到位就及时埋没到位。配合土建结构施工进度,及时做好各层的防雷引下线焊接工作。
3、施工收尾阶段的电气施工方法。在土建工程砌筑隔断墙之前应与土建工长和放线员将水平线及隔墙线核实一遍,因为它是电气人员按此线确定管路予埋的位置及确定各种灯具、开关插座的位置、标高。在土建抹灰之前,电气施工人员应按内墙上弹出的水平(50 线)、墙面线 (冲筋) 将所有电气工程的予留孔洞按设计和规范要求查对核实一遍,符合要求后将箱盒稳注好。将全部暗配管路也检查一遍,然后扫通管路,穿上带线,堵好管盒。抹灰时,配合土建做好配电箱的贴门脸及箱盒的收口,箱盒处抹灰收口应光滑平整,不允许留大敞口。做好防侧雷的均压线与金属门窗、玻璃幕墙铝框架的接地连接。配合土建安装轻质隔板与外墙保温板,在隔墙板与保温板内接管与稳盒时,应使用开口锯,尽量不开横向长距离槽口,而且应保证开槽尺寸准确合适。电气施工人员应积极主动和土建人员联系,等待喷浆或涂料刷完后进行照明器具安装;安装时,电气施工人员一定要保护好土建成品,防止墙面弄脏碰坏。当电气器具已安装完毕后,土建修补喷浆或墙面时,一定要保护好电气器具,防止器具污染。一个建筑物的施工质量与内装修和墙面工程有很大关系,内线安装的全面施工虽然应在墙面装饰完成后进行,但一切可能损害装饰层的工作都必须在墙面工程施工前完成。因此,必须事先仔细核对土建施工中的预埋配合、预留工作有无遗漏,暗配管路有无堵塞,以便进行必要的补救工作。如果墙面工程结束后再凿孔打洞,则会留下不易弥补的痕迹。工程施工实践表明,建筑电气安装工程中的施工配合是十分重要的,要做好配合工作,电气施工人员要有丰富的实践经验和对整个工程的深入了解,并且在施工中要有高度的责任心。
三、结语
随着工程建设的蓬勃发展和工程技术的不断进步,电气工程是城市的基础设施,工业生产和人民生活的命脉之一,电气工程日趋向大系统、高参数的方向迅猛发展,因此对电气工程的设计、施工、维修和运行管理。要求也越米越高,要想使电气系统达到优质、高效、低能耗运的目的,除要有合理的设计方案外电气系统,配电线路、低压开关的安装等质最的优劣将会对日后的使用产生极大的影响,为了确保民用电气在使用过程中充分发挥其安全、稳定、高效作用。故民用建筑电气系统的安装、施工技术及质量控制极其重要。本文阐述一些个人的观点,可供同行参考借鉴。
参考文献
[1] 于芳.简述电气安装工程的施工重点 [J] .石河子科技,2008 (5) ..
[3] 董瑞海.浅谈电气安装工程的施工质量管理[J] .装备制造,2009 (5) .
[4] 何建成.谈民用建筑电气施工安装和质量问题 [J] .广东建材,2009 (6) .
关键词:民用建筑施工; 电气施工; 前期准备工作; 电气安装方法
Abstract: with the development of modern electronic industry, the requirement of intelligent building more and more is also high, the corresponding electrical building construction involves the pipeline more and more, but because construction unit to construction standard of understanding of degree is uneven, completed the project in the building electric engineering function affected or unsafe, or even to the main structure building threat, so need to be in construction process in controlled. How to improve the construction quality of electrical engineering, ensure civil electrical in use process give full play to its security, stability, high effect, be civil building construction technology and quality control electric focus. This paper made a in-depth analysis of this research, available for peer for reference.
Keywords: civil building construction; The preparatory work; Electrical installation method
中图分类号:F407.6 文献标识码:A 文章编号
前言
随着经济生活水平的不断提高,人们对电气安装工程质量有了更高的要求。目前,我国各种电气设备和民用電器有了很大的发展,民用建筑电气安装工程也应提高安装技术,以适应人们生活水平的需要。电气安装工程施工是建筑工程质量的重要保证,对竣工交付后住户的安全和正常使用意义重大。电气工程施工质量的好坏直接影响到建筑物功能是否正常运行,关系到该建筑的社会与经济效益。因此,必须加强民用建筑的电气施工管理。
一、电气工程施工前期的工作分析
设计图纸技术交底:在技术交底前,施工方除仔细认真地审图查找问题外,还要根据设计要求和施工图中的重点,注意对照强制性标准、施工验收规范和规条文说明,查看设计中有无不符规范要求之处;同时,施工人员除熟悉本专业技术外,还要了解相关专业知识,并及时做好预检记录。对施工用材料也要做好准备。焊管要求内壁光滑,无砂眼、毛刺、裂缝凹陷等缺陷。绝缘导管采用中型以上导管及配件外壁要有间距连续阻燃标记和制造厂标、管壁厚度均匀,符合规范要求,无破及管身变形现象。按线盒外观整齐,敲落孔齐全,无破裂及变形现象。配电箱壳体有一定的机械强度,周边平整无损伤,油漆完好无变形现象,接地排齐全。进场的材料必须符合设计要求,三证齐全且有进场检验记录。焊管敷设前,对其内壁刷防腐漆,钢管外壁根据敷设方式进行不同的防腐处理。钢管采用钢锯进行切割,管内铁屑清除干净。PVC 管使用剪管器,钢锯切割,断口后将管口锉平齐,保证管口平整光滑。提前编制电气预留孔洞方案,对电气预留孔洞的尺寸、标高及时向土建专业交底,电气专业负责复核。预埋前充分了解土建结构。在电气预埋时,要根据各施工作业段的大小、各类电气管线的多少,派专人负责与土建协调,同时选技术熟练的工人进行管线预埋,预埋结束自检合格后立即通知监理方进行验收,并及时办好隐蔽工程验收手续,以便土建尽早进入下一道工序,提高工作效率。
二、施工中各个阶段的电气安装方法分析
1、基础施工阶段的电气安装方法。在基础工程施工时,应及时配合土建做好强、弱电专业的进户电缆穿墙管及止水挡板的予留予埋工作。这一方面要求电专业应赶在土建做墙体防水处理之前完成避免电气施工破坏防水层造成墙体今后渗漏;另外一方面要求格外注意予留的轴线,标高、位置、尺寸、数量用材规格等方面是否符合图纸要求。进户电缆穿墙管和予留予埋是不允许返工修理的,返工后土建二次做防水处理很困难也不易所以电专业施工人员特别留意与土建的配合。按惯例尺寸大于 300mm 的孔洞一般在土建图纸上标明,由土建负责留,这时电气工长应主动与土建工长联系,并核对图纸,保证土建施工时不会遗漏。配合土建施工进度,及时做好尺寸小于300mm、土建施工图纸上未标明的予留孔洞及需在底板和基础垫层内暗配的管线及稳盒的施工。对需要予理的铁件、吊卡、木砖、吊杆基础螺栓及配电柜基础型钢等予理件,电气施工人员应配合土建,提前做好准备,土建施工到位及时埋入,不得遗漏。根据图纸要求,做好基础底板中的接地措施,如需利用基础主筋作接地装置时,要将选定的柱子内的主筋在基础根部散开与底筋焊接,并做好色标记,引上留出测接地电阻的干线及测试点,比如还需砸接地极时,在条件许可情况下,尽量利用土建开挖基础沟槽时,把接地极和接地干线做好。
2、结构施工阶段的电气安装方法。根据土建浇铸混凝土的进度要求及流水作业的顺序,逐层逐段地做好电管暗敷工作,这是整个电气安装工程的关键工序,做不好不仅影响土建施工进度与质量,而且也影响整个电气安装工程的后续工序的质量与进度,应引起足够的重视。现浇混凝土楼板内配管时,在底层钢筋绑扎完后,上层钢筋未绑扎前,根据施工图尺寸位置配合土建施工。注意不要踩坏钢筋。土建浇注混凝土时,电工应留人看守,以免振捣时损坏配管或使得灯头盒移位。遇有管路损坏时,应及时修复。对于土建结构图上已标明的予埋件如电梯井道内的轨道支架予理铁等以及尺寸大于 300 的予留孔洞应由土建负责施工,但电气工长也随时检查以防遗漏。对于要求专业自己施工的予留孔洞及予埋的铁件、吊卡吊杆,木砖、木箱盒等,电气施工人员应配合土建施工,提前做好准备,土建施工一到位就及时埋没到位。配合土建结构施工进度,及时做好各层的防雷引下线焊接工作。
3、施工收尾阶段的电气施工方法。在土建工程砌筑隔断墙之前应与土建工长和放线员将水平线及隔墙线核实一遍,因为它是电气人员按此线确定管路予埋的位置及确定各种灯具、开关插座的位置、标高。在土建抹灰之前,电气施工人员应按内墙上弹出的水平(50 线)、墙面线 (冲筋) 将所有电气工程的予留孔洞按设计和规范要求查对核实一遍,符合要求后将箱盒稳注好。将全部暗配管路也检查一遍,然后扫通管路,穿上带线,堵好管盒。抹灰时,配合土建做好配电箱的贴门脸及箱盒的收口,箱盒处抹灰收口应光滑平整,不允许留大敞口。做好防侧雷的均压线与金属门窗、玻璃幕墙铝框架的接地连接。配合土建安装轻质隔板与外墙保温板,在隔墙板与保温板内接管与稳盒时,应使用开口锯,尽量不开横向长距离槽口,而且应保证开槽尺寸准确合适。电气施工人员应积极主动和土建人员联系,等待喷浆或涂料刷完后进行照明器具安装;安装时,电气施工人员一定要保护好土建成品,防止墙面弄脏碰坏。当电气器具已安装完毕后,土建修补喷浆或墙面时,一定要保护好电气器具,防止器具污染。一个建筑物的施工质量与内装修和墙面工程有很大关系,内线安装的全面施工虽然应在墙面装饰完成后进行,但一切可能损害装饰层的工作都必须在墙面工程施工前完成。因此,必须事先仔细核对土建施工中的预埋配合、预留工作有无遗漏,暗配管路有无堵塞,以便进行必要的补救工作。如果墙面工程结束后再凿孔打洞,则会留下不易弥补的痕迹。工程施工实践表明,建筑电气安装工程中的施工配合是十分重要的,要做好配合工作,电气施工人员要有丰富的实践经验和对整个工程的深入了解,并且在施工中要有高度的责任心。
三、结语
随着工程建设的蓬勃发展和工程技术的不断进步,电气工程是城市的基础设施,工业生产和人民生活的命脉之一,电气工程日趋向大系统、高参数的方向迅猛发展,因此对电气工程的设计、施工、维修和运行管理。要求也越米越高,要想使电气系统达到优质、高效、低能耗运的目的,除要有合理的设计方案外电气系统,配电线路、低压开关的安装等质最的优劣将会对日后的使用产生极大的影响,为了确保民用电气在使用过程中充分发挥其安全、稳定、高效作用。故民用建筑电气系统的安装、施工技术及质量控制极其重要。本文阐述一些个人的观点,可供同行参考借鉴。
参考文献
[1] 于芳.简述电气安装工程的施工重点 [J] .石河子科技,2008 (5) ..
[3] 董瑞海.浅谈电气安装工程的施工质量管理[J] .装备制造,2009 (5) .
[4] 何建成.谈民用建筑电气施工安装和质量问题 [J] .广东建材,2009 (6) .