论文部分内容阅读
通过对赵各庄矿2497大倾角单体柱支护工作面过2 ~3m断层群的技术分析, 总结了大倾角单体柱配铰接梁支护工作面过断层的经验, 其经验值得借鉴和推广。
Through the technical analysis of 2 ~ 3m fault group of 2497 large dip monolithic support working face in Zhaogezhuang Mine, the experience of over-fault on the large angle single column with hinged beam support working face is summarized, and its experience is worth learning from Promotion.