论文部分内容阅读
南水北调中线一期工程总干渠膨胀岩(土)试验段工程(潞王坟段),位于南水北调中线工程总干渠第Ⅳ渠段,在新乡市潞王坟乡,长1.50 km。膨胀岩(土)试验段工程(潞王坟段)渠道塌滑体施工在南水北调中线工程中具有一定代表性,其施工方法、质量和安全较难控制,文章以潞王坟试验段工程塌滑体为对象进行施工技术论述。
Expansion rock (soil) test section of the main canal of the middle stage of the South-to-North Water Diversion Project (Luwangdian section) is located at the section IV of the main canal of the midline of the South-to-North Water Diversion Project and 1.50 km in Luwangcun Township, Xinxiang City. Expansive rock (soil) test section (Lu Wang grave) channel collapse body construction in the midline of the South-to-North Water Diversion Project has a certain representation, the construction method, quality and safety more difficult to control the article Lu Wang Fen test section collapse Body for the object of construction technology discussion.