论文部分内容阅读
Engineering-oriented constraint of harness technology has much information and project information presents progressive changes along with the design. Therefore, how to handle conflict resolution quickly is a problem to be solved. Process model of con- flict detection is put forward according to characteristics of harness technology design engineering-oriented constraint, and then two problems of how to conduct conflict positioning and judgment of constraint rules are introduced in this paper. Afterwards in this pa- per, constraint information directed acyclic graph is established by classified project constraint information to solve the conflict posi- tioning problem; solution of constraint satisfaction problem is applied to realize judgment problem of constraint rules. Finally, exam- ple is used to analyze the method in this paper to further verify the correctness and effectiveness of this method.