现行《选矿厂尾矿设施设计规范》(ZBJ 1-90)规定以洪水运行做为稳定计算荷载组合的一种组合工况,本文从尾矿库及其坝体运行条件进行分析,指出该种荷载组合对部分尾矿坝而言不符合其实际运行情况;并就尾矿坝稳定计算中库水位的选择进行了探讨。
The current “Design Specification for the Concentrator tailings facilities” (ZBJ 1-90) stipulates that flood operation should be regarded as a combination of stable load combinations. This paper analyzes the operating conditions of the tailings pond and its dam, and points out that this kind of The load combination does not fit the actual operation of some tailings dams and the choice of reservoir water level in the stability calculation of tailings dams is discussed.