我矿新建尾矿坝工程,地处两山狭谷,采用6座泵站接力扬送尾矿,选用4PNJ胶泵又而临其水封装置需用高压水(5~7公斤/厘米~2)的困难,因而被迫仿石家庄水泵厂副叶轮装置进行试制和生产试验。由于技术参数、结构以及材质的耐磨性尚存在一定问题,使用寿命很短,维修量大,不能满足我矿生产条件—矿浆不足、管线长、倒灌压力大的特殊要求。
I mine the new tailings dam project, located in two mountain valleys, the use of six pumping station to send tailings Yang relay, the choice of 4PNJ glue pump and then its water seal required high pressure water (5 ~ 7 kg / cm ~ 2 ), Which forced him to imitate Shijiazhuang Pump Plant vice impeller device trial and production test. Due to technical parameters, structure and wear resistance of the material there are still some problems, the service life is very short, a large amount of maintenance, can not meet the conditions of mine production - lack of pulp, pipeline length, the pressure of a large backfill special requirements.