介绍了该系统的改造方案。在湿负荷计算基础上初选除湿设备,进而校核实际除湿量和洞库内空气参数。介绍了机房布置、系统运行模式、自动控制及消声减振等。
Introduced the system transformation plan. On the basis of wet load calculation, primary dehumidification equipment is selected, and then the actual dehumidification capacity and the air parameters in the tunnel are checked. Introduced the engine room layout, system operation mode, automatic control and noise damping.