Unit commitment (UC) is to determine the optimal unit status and generation level during each time interval of the scheduled period. The purpose of UC is to min
The ?method is used in this paper to calculate the leakage magnetic field of SSZ11-50000/110 Power transformer, and by which the structures’ influences to the