论文部分内容阅读
沈阳铁路局电务段为方便生产,确保运输安全,在学习兄弟单位经验的基础上,试制了一台携带式电缆测试台。过去测试电缆需要请求各种电气设备停止使用,把电缆芯线和设备分开后用兆欧表进行测试。这样对铁路运输干扰很大,并且需要投
In order to facilitate the production and ensure the safety of transportation, the electric railway service of Shenyang Railway Bureau trial-built a portable cable test bench on the basis of learning the experience of its brother units. In the past the test cable requires the request of a variety of electrical equipment to stop using the cable core and equipment separate test with a megger. This is a major disruption to rail transport and requires investment