论文部分内容阅读
一、运行概况云南省六郎洞电厂,装有两台 HL638—LJ—140型水轮机,引用喀斯特地下潜流发电。其参数:设计水头117月互;额定出力安装高程 963。3 m; +l r已; 13。7m"/s; 0。06;额定转速吸出高程制造厂设计流程制造
I. Operational Overview Lianyungang Power Plant in Yunnan Province is equipped with two HL638-LJ-140 turbines, making reference to the subsurface flow in karst power generation. The parameters of the design head 117 months each; rated output installation elevation of 963.3 m; + lr has been; 13.7m / s; 0.06; rated speed suction elevation manufacturing process design