挤压水泥管材及接头工艺研究

来源 :农田水利与小水电 | 被引量 : 0次 | 上传用户:longer9568
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、管材配比试验管材配比试验的目的是:既要满足低压输水管道的防渗要求,又要尽可能降低水泥管的造价,从而找到一个管材最佳配比方案及制管工艺。整个试验中我们始终以管材的抗压强度、抗渗性能为控制管子质量的主要标准,寻找出管材的最佳配方。经过多次的反复试验,最后找出了水泥制管的最佳配方和理想的制管工艺。按照新配方新工艺生产的 First, the ratio of pipe material pipe test The purpose of the test is: it is necessary to meet the seepage requirements of low-pressure water pipelines, but also to reduce the cost of cement pipe as much as possible, so as to find the best ratio of a pipe and pipe manufacturing process. Throughout the experiment, we always take the pipe compressive strength, impermeability as the main standard to control the quality of the pipe, to find the best formula for the pipe. After repeated trial and error, finally found out the best formula of cement pipe and pipe manufacturing process. According to the new formula new technology production
其他文献
国际水资源协会(International Water Resources Association),是一个非政府性的科技组织。 The International Water Resources Association is a non-governmental scient
1、水头计算公式位置水头H_1=h(m);压力水管H_2=P/ω=P/1000=10P_0(m);速度水头H_3=v_2/2g(m)。式中h为相对于基准平面的高度(m);P为水压(kg/m~2);P_0为水压(kg/cm~2);ω为
混流泵是平原、坡地的主要提水工具,在我县排灌站中占90%以上,由于设计,施工和管理上的各种问题,造成泵站装置效率较低,耗能高。我县去年实测150座中小型 The mixed flow p
为了深化水利改革,搞活水利管理单位的经济,促进农业丰产稳产,山西省忻州地区五寨县南峰水利管理站把风险和竞争机制引入水利管理中,于1988年初实行了全员抵押承包。一、基
通榆河在我省苏北东部地区,规划南起南通市接通长江,北至连云港市、赣榆县,全长360公里,是基本平行于京杭大运河的又一条苏北运河。该河从1958年起就进行了规划,并实施了部
煤炭工业部王显政副部长在煤炭出口工作会议上的讲话(摘要)(1996年4月10日)同志们:刚才郭可沐同志对去年的煤炭出口工作做了总结,对今年的工作进行了具体安排和部署。这些我都同意。1995年,全国
我受市政府的委托来参加这次召开的三峡工程领导小组第10次(扩大)会议,深感机会难得。我听了陆副部长开幕时的重要讲话,听了长办总工程师王家柱同志对《长江三峡水利枢纽可
装置立轴轴流式水轮发电机组的小型水电站,当检修水轮机时,为排除蜗壳积水,水轮机制造厂均随机配给蜗壳放水阀。放水阀一般布置在蜗壳+Y 与+X 座标范围内,这种蜗壳放水阀,在
巍巍太行,哺育了多少英雄儿女;悠悠千载,愚公移山的意志、女娲补天的精神,感召着代代太行人。古往今来,这片神奇的土地上演绎了多少传奇……让这里的水更清、山更绿,让这里的
本文基于对比语言学和体裁分析理论,从语用、语法和语义三个角度研究了中英文科技期刊摘要四语步中的模糊限制语使用的共性和差异,并从英汉两种文化和思维特征角度对其进行阐