【摘 要】
:
1997年4月,杭州制氧机总厂在全面完成生产计划的情况下,从生产制造部又传来喜讯:工艺性协作完成140余万元,为计划的351%,为去年同期的154%,1—4月份已累计完成354万元,为年
论文部分内容阅读
1997年4月,杭州制氧机总厂在全面完成生产计划的情况下,从生产制造部又传来喜讯:工艺性协作完成140余万元,为计划的351%,为去年同期的154%,1—4月份已累计完成354万元,为年度计划800万元的44%。四月份各专业厂在确保完成生产计划的前提下,十分注意工艺性协作生产。各专业厂充
In April 1997, the Hangzhou Oxygen Generator Plant completed the production plan, and another good news came from the manufacturing and manufacturing department: the technical cooperation completed more than 140 million yuan, which was 351% of the plan, compared with 154% of the same period last year,1 - A total of 3.54 million yuan was completed in April, which is 44% of the annual plan of 8 million yuan. In April, under the premise of ensuring the completion of the production plan, each professional factory paid great attention to the process of collaborative production. The professional factory charge
其他文献
正当NetPC本月开始走下生产线之时,几个主要的NetPC拥护者开始动摇对这一体系结构的支持。由于用户对NetPC反应冷淡,IBM和Digital公司正在完全终止NetPC计划的推出或仍继续
1997年5月15日、16日两天,公司近三千名员工带着美好的祝愿在印有“庆祝香港回归”。字样的长卷上签了名。这次杭城十万员工大签名活动是由市总工会发起的,我公司是这次传递
“我们能占数据库管理系统的20%。”正在筹备成立的PLATINUM(中国)公司董事总经理冯星君满怀信心地对记者说。SAS、BMC等数据库开发工具商、代理商们下断在各种巡展、展览等
请下载后查看,本文暂不支持在线获取查看简介。
Please download and view, this article does not support online access to view profile.
在IE 4.0正式发布前夕,Microsoft的准备工作也在紧锣密鼓地进行,日前Microsoft公布了移植工具、Web浏览技术及合作协议,以使IE 4.0更好地融合到Web站点之中。 9月15日Micros
Primera公司最新的可进行Web访问的销售管理软件新近出台,这意味着销售人员可以更加容易的了解公司情报,PrimEnterprise包括4个模块:Contact Management、Opportunity Manag
一、填空题(第1一37题见本刊第6期) 38.民兵坚持独立作战通常是在—,也可能在我战略、战役纵深或后方进行—、一—,以及、—~—一一一一一等。 39.民兵对作战部队卫勤保障支
黄骅渤海自行车(集团)股份有限公司总占地面积14万平方米,总建筑面积5万平方米,企业总资产9800多万元,职工1246人,其中:专业技术人员96人、大中专毕业生48名。一九九六年实
杭氧1997年5月份全面完成了各项主要经济指标,为上半年1.7亿元商值的完成打下了比较好的基础。但要确保上半年的生产任务,6月份的生产难度依然很大。5月份总厂共完成产值260
杭州制氧机集团有限公司从1997年1—10月,累积承接合同金额已超过4亿元人民币,提前超额完成了年产品订货指标。1997年10月,争取到了河北承德6500m~3/h 空分设备;1997年11月,