我局引进两套西德综采设备,于1980年元月份陆续到货,地面检测组装试运工作五月份结束.一套在三矿七月份下井安装.八月份试生产,九月份正式投产.另一套在六矿1981年元月投产,投产以来,电气设备工作基本正常,各种电气控制和电子保护装置一直坚持使用,未发生过大的事故.这两套设备的电气部分,在我国引进的综采设备中,是最复杂、较为先进的.省局和矿务局领导都非常重视,设备到货前就组织了有关工程技术人员、工人到开滦等兄弟局学习,搜集和复制了有关技术资料,为设备的验收,检测和试运工作做好了充分的精神和技术准备.参加检测试运的人员技术上
Our bureau introduced two sets of West Germany fully mechanized mining equipment and arrived one after another in January of 1980. The commissioning of ground inspection and assembly work ended in May and one set went down well in July of the third mine and trial production took place in August and put into production in September. Another set in the sixth mine in January 1981 put into production, put into operation since the basic normal electrical equipment work, all kinds of electrical control and electronic protection devices have always insisted on using, there was no major accident occurred.The electrical part of these two sets of equipment in our country The introduction of fully mechanized mining equipment, is the most complex and more advanced. Provincial Bureau and Bureau of Mining leaders attach great importance to the equipment before the arrival of the organization of the engineering and technical personnel, workers and other brothers to Kailuan learning to collect and copy The relevant technical information for the equipment acceptance, testing and commissioning work done a full spirit and technical preparations. Participate in the testing and testing of personnel technically