论文部分内容阅读
赣抚平原水利工程建成以后,发挥了巨大的社会效益和经济效益。但是,由于该工程原设计标准偏低,渠系配套不全,再加上工程质量有些问题,所以很长时间工程效益没有充分发挥出来。1984年以前,灌溉面积69万亩,仅占设计灌溉面积的57.5%,且有继续下降的趋势。为了尽快改变“大工程低标准,老工程低效益”的状况,从1984年开始,我们遵照“加强经营管理,讲究经济效益”的水利方针和水利部关于“水利一定要办,办法一定要改”的指示精神,把搞好工程续建配套摆上
After the completion of the Gan River plain water conservancy project, it has exerted tremendous social and economic benefits. However, due to the low original design standard of the project and the incomplete canal system, coupled with some problems in the project quality, the engineering benefits have not been brought into full play for a long time. Before 1984, the irrigated area was 690000 hectares, accounting for only 57.5% of the designed irrigated area, and there was a tendency to continue to decline. In order to change the status of “low standards for major projects and low efficiency for old projects” as soon as possible, we have followed the water policy of “strengthening management and stressing economic benefits” since 1984, and the Ministry of Water Resources on the principle of “water conservancy must be done and methods must be changed ”The spirit of the instructions, to do a good job supporting continued construction of the project