论文部分内容阅读
电力部成都勘测设计研究院成立于1955年,成立初期负责西南三省(云、贵、川)的勘测设计任务,目前负责四川省和西藏自治区的水电水利勘测设计任务。1992年荣获全国勘测设计单位综合实力百强的第21位。全院拥有职工2500余人,其中专业技术人员1500余人,具有高级职称的400余人(内享受教授级待遇的52人)。关于水电站的自动化,成都院早在50年代即对新建成的四川龙溪河梯级水电站进行过梯级电站远动集控设
Ministry of Electric Power Chengdu Survey and Design Institute was established in 1955 and was initially responsible for the survey and design tasks of three provinces in the southwest (Yunnan, Guizhou and Sichuan). Currently, it is responsible for the survey and design of hydropower and water conservancy projects in Sichuan Province and Tibet Autonomous Region. In 1992 won the national survey and design units comprehensive strength of the top twenty hundred. The hospital has more than 2,500 employees, of which more than 1,500 professional and technical personnel, with more than 400 senior titles (who enjoy the treatment of the professor-level 52). As for the automation of hydropower stations, Chengdu Institute conducted remote control of cascaded power plants as early as the 1950s at the newly built Longxi River cascade hydropower station in Sichuan