第一机械工业部和水利电力部于1978年12月8日至14日在上海闵行召开了12.5万千瓦火电机组的鉴定会议。会议本着质量第一和实事求是的精神对12.5万千瓦汽轮机、发电机(闸北发电厂15号机)和400吨/时锅炉(淮南发电厂3号炉)进行了鉴定。国产第一台12.5万千瓦火电机组于1969年在上海关泾热电厂投运以来,全国已有二十多台相继投入运行。十年来在制造、运行、安装、科研等单位及高等院校的共同努力与相互配合下,机组经过不断改进,运行日趋稳定,已成为电网的主力
Ministry of Machinery Industry and Ministry of Water Resources on December 8, 1978 to December 14 held in Shanghai Minhang 125,000 kilowatts thermal power units identification meeting. Meeting in the spirit of quality and the spirit of seeking truth from facts on 125,000 kilowatts turbine, generator (Zhabei Power Plant 15) and 400 tons / h boiler (Huainan Power Plant No.3 furnace) were identified. The first domestic 125,000-kilowatt thermal power unit put into operation in Shanghai Guan Jing Thermal Power Plant in 1969, more than 20 units have been put into operation nationwide. Over the past decade, with the joint efforts and mutual cooperation of manufacturing, operation, installation and scientific research institutes and institutions of higher learning, the unit has become the main power grid after its continuous improvement and stable operation