论文部分内容阅读
<正>1 Introduction A series of engineering tests and physical experiments,including ECRH[1],was carried out on the HL-2A tokamak in 2005.A fast arcing protection system[2] was developed to ensure operating of ECRH facilities[3],especially the gyrotro