从80年代初开始,国家就把三峡电力工程设备的前期研究列入了国家重大技术装备攻关计划,“八五”和“九五”期间相继列入重大科技攻关计划,如“500kV输变电设备长期带电试验”等,在经费上给予了很大的支持。国家将东方电机股份有限公司、哈尔滨电机厂有限责任公司、第一重型机械厂、第二重型机械厂等企业列入国家建设计划,在“九五”期
Since the beginning of the 1980s, the country has included the preliminary research of the Three Gorges Power Engineering Equipment in the national major technical equipment research program, and has been listed in major scientific and technological research projects during the “Eighth Five-Year Plan” and “Ninth Five-Year Plan” period, such as “500kV power transmission and transformation The long-term electrification test of equipment has given great support in terms of funding. The state has included Dongfang Electric Machinery Co., Ltd., Harbin Electric Machinery Co., Ltd., No. 1 Heavy Machinery Plant, No. 2 Heavy Machinery Plant and other companies in the national construction plan during the Ninth Five-Year Plan period.