结合宁波轨交1号线一期工程TJ-Ⅷ标东环南路站工程,参建单位对基坑结构风险进行了静态分析与评估,并对基坑设计方案进行了优化。在基坑开挖过程中,通过“三图四表”管理制度对基坑开挖过程进行动态实时的控制,采取了一系列针对基坑变形的控制措施,顺利完成了该站主体基坑的开挖作业。可供欠固结土地区深基坑的设计和施工参考。
Combined with the project of TJ-Ⅷ East of Donghuan South Station of the first phase project of rail transit line 1 of Ningbo, the unit involved in construction conducted a static analysis and assessment of the pit structure risk and optimized the design scheme of the pit. In the process of excavation, a series of control measures for excavation deformation were adopted to control the excavation process of foundation pit dynamically and in real time through the management system of “Three plans and four tables” Pit excavation work. Design and construction of deep foundation pit for under consolidated soil area.