大型水利水电工程的大坝混凝土浇筑,很大程度上制约着整个工程的工期和投资,因此在施工组织设计中研究坝体浇筑过程、机械配备和相应的施工进度是十分重要的。采用人工跳块研究这些问题,既费时又费工,难以在较短时间内作多种方案比较。计算机模拟技术为解决这类问题开辟了新的途径。二滩水电工程大坝混凝土浇筑,在初设优化中运用这一技术
Large-scale water conservancy and hydropower project dam concrete placement, largely restricts the entire project duration and investment, so in the construction design of the dam pouring process, mechanical equipment and the corresponding construction schedule is very important. The use of artificial jump block to study these issues, both time-consuming and laborious, it is difficult to compare a variety of programs in a relatively short period of time. Computer simulation technology has opened up new avenues for solving such problems. Ertan hydropower project dam concrete pouring, in the initial optimization of the use of this technology