分析了安钢股份公司烧结厂对 114m2 鼓风带冷却机在运行中出现的问题 ,并针对故障部位进行改进 ,从而保障生产正常运行。
The problems of the 114m2 blasting belt cooler during the operation of the Sintering Plant in Anyang Iron & Steel Co., Ltd. were analyzed. The fault site was improved to ensure the normal operation of the production.