论文部分内容阅读
支撑高度大于或等于4.0m的梁板楼(屋)盖模板支撑架多采用扣件式钢管搭设,如果搭设不当,容易出现支模架坍塌事故。为了杜绝重大事故、减少一般事故的发生,在扣件式钢管支模架搭设过程中,除了按照《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130—2001)要求编制专项施工方案以
Support plate height of greater than or equal to 4.0m House (housing) cover template support frame to use more fastener-type erection, if improperly set up, prone to support frame collapse accident. In order to prevent a major accident and reduce the occurrence of a common accident, during the process of erecting a steel pipe mold support frame, a special construction plan shall be prepared in accordance with the requirements of “Technical Code for Safety of Steel Fasteners for Scaffolding of Construction Fasteners” (JGJ130-2001)