1.“九五”朋末,全区发电装机达到900万kW,年发电量达到400亿kW·h,500kV线路2170km,变电容量500万kVA。220kV线路5180km,变电容量830万kVA。水电开发以促使龙滩工程1998年开工为主要目标,争取恶滩(60万kW)开工,抓紧平班(36万kW)前期工作,同时保证百龙滩水电站各台机组按时投产。火电开发集中力量抓好中外合资北海电厂一期(2×30万kW)的建设,同时积极配合来宾B厂的建设,抓好五合电厂及钦州电厂的前期工作,尽快落实桂林电厂“以大代小”项目,研究合山、田东电厂“以大代小”工作。抓紧抽水蓄能电站的前期工作,开展核电的前期规划工作。
1. At the end of the Ninth Five-Year Plan period, the district’s power generation capacity reached 9 million kW, annual power generation reached 40 billion kW·h, 500 kV line 2170 km, and substation capacity 5 million kVA. The 220kV line is 5180km and the variable capacity is 8.3 million kVA. Hydropower development to promote Longtan project started in 1998 as the main goal, strive to Eton (600,000 kW) start work, pay close attention to the level of work (360,000 kW) preparatory work, while ensuring that each unit of the Bailongtan Hydropower Station put into operation on time. The development of thermal power will focus on the construction of Phase 1 (2×300,000 kW) of the Sino-foreign joint venture Beihai Power Plant. At the same time, it will actively cooperate with the construction of the guest B plant, do a good job of the preliminary work of the Wuhe Power Plant and the Qinzhou Power Plant, and implement the Guilin Power Plant as soon as possible. On behalf of the “small” project, research Heshan, Tiandong power plant “to the big generation of small” work. Grasp the preliminary work of the pumped storage power station and carry out the preliminary planning work of nuclear power.