水利水电工程观测项目投资,即实施工程全部观测项目的总费用,一般由仪器设备费、项目仪器设备的施工安装费、施工期观测费及其他费用组成。已往在计划经济管理体制下,只是在初设阶段,按工程直接投资的一定比例列出一项观测费用,作为包干使用,设计不作预算编制,施工也不进行最终决算,当出现明显超概算情况时,一般通过设计概算修编来解决。这种作法,对原型观测如此重要的实体工程而言,显然是不合理的,因为它与整个观测系统的实际工作量脱离,投资与
The total cost of water conservancy and hydropower project observation project investment, that is, the total observation project of the implementation of the project, is generally composed of equipment and equipment costs, construction and installation costs of project equipment, construction observation fees and other expenses. In the past, under the planned economic management system, only a certain percentage of the direct investment in construction was used to list a survey fee only during the initial stage of construction, without making any budgetary preparation for the design and no final accounting for the construction. When there was a clear overstatement When, generally through the design budget revision to solve. This approach, apparently for unrelated substantive projects such as prototyping, is obviously unreasonable because of its departure from the actual workload of the entire observing system, investment and