论文部分内容阅读
这是一所在原有基础上进行扩建的寄宿学校。首先,必须解决新楼和旧楼间的平面联系。新旧两幢楼房都是四层:底层为半地下室,安排各种辅助用房;二层为中心大厅、音乐教室和食堂.并设有烹饪实习室;三层和四层是教室、办公室及学生宿舍,在新楼第三层安排了课余活动室。新楼和旧楼间布置了走廊和门厅,以解决新旧建筑物间的交通联系问题。下面介绍课余活动室的设计。
This is a boarding school that is based on the original expansion. First of all, we must solve the flat connection between the new building and the old building. The two old and new buildings are four floors: the basement is a semi-basement, and various auxiliary rooms are arranged; the second floor is the center hall, music classroom and canteen, and there is a cooking laboratory; the third and fourth floors are classrooms, offices, and students. In the dormitory, an extracurricular activity room was arranged on the third floor of the new building. Corridors and entrance halls are arranged between the new building and the old building to solve the problem of transportation links between old and new buildings. The following describes the design of the extracurricular activity room.